| Engineering Review of the Ove Arup report on the reconnection of NNR to Network Rail at Sheringham | Solutions for the re-establishment and operation of a level crossing at Sheringham, provision of combined station facilities for the North Norfolk Railway and Network Rail lines, and enabling of eventual through-running between the two lines. | VIEW |
| Proposed layout at Sheringham | Scale drawing of the proposals in the Engineering Review | VIEW |
| Local Development Framework Topic Paper - TRANSPORT |
North Norfolk District Council paper on transport issues produced as part of the process of formulating a definitive transport policy for the district. Reproduced here with permission. |